CONCRETE SURFACE

PX-100 Coating System Application Steps

Surface/Substrate Preparation – provide a dry, clean and level surface

  • Clean substrate – remove any surface debris
  • Etch Substrate – blast and/or grind surface
  • Repair substrate – repair any cracks and holes
  • Clean substrate – remove any remaining dust/debris

Apply PX-100 Base Coat (Clear or Color)

  • Apply base coat at approximately 3 mils thickness to provide a uniform base.
  • Allow surface to dry to tack free – approximately 1-2 hours

Apply PX-100 Tack Coat (Clear or Color)

  • Apply a second tack coat at approximately 3 mils thickness
  • For Flake Application – broadcast color flakes uniformly to surface
  • Allow surface to cure approximately 1-2 hours prior to application of top coat

Apply PX-100 Top Coat (Clear Coat)

  • Apply a single top coat of at approximately 3 mils thickness.
  • Apply additional top coat if a very smooth surface is desired or with flake applications.

Slip-Resistance and Matte Top Coat Additives Available (optional)

  • If additional slip resistance is required (recommended)
  • If less gloss is desired from standard top coat application
Step 1 Surface Prep | Best Flex Coatings

Step 1: Surface/Substrate Preparation

Step 1: Surface Prep 1 | Best Flex Coatings

Step 1: Surface/Substrate Preparation

Step-2 Apply Base Coat | Best Flex Coatings

Step 2: Apply Base Coat

Step3 Apply Tack Coat & Flake Broadcast

Step 3: Apply Tack Coat & Flake Broadcast

Step-4 Apply Top Coat | Best Flex Coatings

Step 4: Apply Top Coat

Final Product | Best Flex Coatings

Step 5: Final Product