START TO FINISH IN ONE DAY!*
The Process
* For many projects, depending on size and preparation required
End to end retail space flooring project
- Professionally applied by trained applicators
CONCRETE SURFACE
PX-100 Coating System Application Steps
Surface/Substrate Preparation – provide a dry, clean and level surface
- Clean substrate – remove any surface debris
- Etch Substrate – blast and/or grind surface
- Repair substrate – repair any cracks and holes
- Clean substrate – remove any remaining dust/debris
Apply PX-100 Base Coat (Clear or Color)
- Apply base coat at approximately 3 mils thickness to provide a uniform base.
- Allow surface to dry to tack free – approximately 1-2 hours
Apply PX-100 Tack Coat (Clear or Color)
- Apply a second tack coat at approximately 3 mils thickness
- For Flake Application – broadcast color flakes uniformly to surface
- Allow surface to cure approximately 1-2 hours prior to application of top coat
Apply PX-100 Top Coat (Clear Coat)
- Apply a single top coat of at approximately 3 mils thickness.
- Apply additional top coat if a very smooth surface is desired or with flake applications.
Slip-Resistance and Matte Top Coat Additives Available (optional)
- If additional slip resistance is required (recommended)
- If less gloss is desired from standard top coat application

Step 1: Surface/Substrate Preparation

Step 1: Surface/Substrate Preparation

Step 2: Apply Base Coat

Step 3: Apply Tack Coat & Flake Broadcast

Step 4: Apply Top Coat

Step 5: Final Product